Product/To run the company/Commercial & post-construction
Win the jobs worth the most
Offices and post-construction cleans get their own request forms, so the square footage, the site, the timing and photos arrive before you pick up the phone. Every request is tracked to a quote, and once it's signed, the job runs like any other.
What changes
Big jobs, quoted like big jobs
Same informal process for a $3,000 job as a $150 one
Dedicated forms for commercial and post-construction
Missing details discovered on site
The details you need, collected up front
Commercial clients expect paperwork you don't have
Every request tracked through to a quote
How it works
From request to booked job
A $2,000 clean deserves more than a text that says "how much for a reno clean?"
Two request forms, separate from the instant quote for homes. The client tells you the square footage, the type of space, what stage the work is at and when it has to be done. The first call is about the job, not about the basics.
Clients upload photos with the request. You see the dust on the ledges and the stickers on the glass before the site walk, so you know what to look for and what to ask.
KnoxEvery site is "basically done". The photos say otherwise.
Requests land in one pipeline, with everything the client sent on one page. You can see what's new, what's quoted and what's booked, so a $3,000 job doesn't sit in an inbox behind a newsletter.
Send the price as a signed quote: the clean, the glass and the touch-up on their own lines, HST shown separately, and what isn't included. The client accepts and signs it on their phone, and you have a record of exactly what was agreed.
Same calendar, same crew app, same payments as your house cleans. Book the touch-up as a follow-up visit and it stays linked to the original job, with its photos and notes.
KnoxBig job, same buttons. I like that in a job.
What's included
Everything in commercial & post-construction
- Commercial cleaning request form
- Post-construction request form
- Photo uploads
- Request pipeline
One request, start to finish
400 King St W: a dental clinic before opening day
One form, one site walk, one signed quote, and a clean that turned into a contract.
- Monday, October 19, 9:12 AM.A request comes in through the post-construction form: Northline Dental Corp., a 3,200-square-foot clinic fit-out, final clean needed before an opening on Monday, November 2. Nine photos. It lands in the pipeline as new.
- Monday, 2 PM.The photos show drywall dust on every ledge and stickers on the glass partitions in all eight operatories. You call the office manager and set a site walk for Wednesday.
- Wednesday, 4 PM.On site with the contractor. Water and power are on, the floors are done, and the millwork installer is back on Friday. That's a touch-up, and it goes in the quote.
- Wednesday, 7 PM.You price it two ways: $1,280 by the square foot, about $1,067 by the hour. You send a signed quote for the final clean, 16 panes of glass and one touch-up, with the exclusions written out. $2,090.50 with HST.
- Thursday, October 22, 10:40 AM.The office manager signs it on her phone and pays the deposit. The final clean is booked for Thursday, October 29, with a crew of three.
- Thursday, October 29.Aisha, Leo and Marcus work from 7 to 2. Photos land on the job room by room.
- Saturday, October 31.The touch-up visit, linked to the original job: millwork dust in two operatories and the front desk. Done by 11.
- Monday, November 2.The clinic opens. The office manager asks what you'd charge to clean it three evenings a week.

The full guide
Everything we'd tell an owner about commercial & post-construction
The three post-construction cleans, what they cost per square foot in Canada (with sources and dates), what moves the price, the site walk, scope and exclusions, and quoting offices. About twelve minutes.
Read the full guide+
Rough, final and touch-up: the three post-construction cleans
A post-construction job is not a big house clean. It's dust that's still settling, stickers on every pane of glass, and a contractor who says the site is ready Tuesday and means a week from Thursday. The quote is where most of the money on these jobs is made or lost, usually on a line nobody wrote down.
Start with the words, because builders, homeowners and cleaning companies use different ones for the same visit. Most of the trade splits the work into three cleans:
| Clean | When it happens | What's in it | What to watch |
|---|---|---|---|
| Rough | After drywall and mechanicals, before paint, flooring and fixtures | Debris and packaging out, floors swept and vacuumed, a first pass on sills and ledges | Builders often do this one themselves. Ask before you price it |
| Final | After the trades finish, before the walkthrough | Top to bottom: vents, light fixtures, walls and trim, cabinets inside and out, glass, stickers and film, floors | The big one. Most of the hours and most of the price |
| Touch-up | After the punch list, before move-in or opening day | The dust the trades brought back, fingerprints, the floor someone walked across | Rarely just one. Price the first, and bill the rest by the hour |
Not every job has all three. A homeowner's kitchen renovation is usually one final clean, maybe with a touch-up. A new commercial unit can have all three spread over six weeks. You'll also hear "builder's clean", "sparkle", "punch clean" and "puff and fluff". Ask what they mean by it, then put your own word and your own scope on the quote.
What post-construction cleaning costs in Canada, per square foot
Most post-construction work is quoted per square foot, because that's how builders and property managers think. Here's what Canadian price guides and cleaning companies published over the last year: other people's ranges, not rules, and not our prices.
| Source | Published | Per square foot (CAD) |
|---|---|---|
| HomeStars price guide, homes | August 2026 | $0.15 to $0.50, with Toronto and Vancouver at the top of the range |
| HomeStars price guide, commercial offices | August 2026 | $0.30 to $0.70 |
| An Ontario cleaning company's price page | April 2026 | $0.25 to $0.45 new-build homes, $0.35 to $0.55 condo units, $0.22 to $0.35 commercial fit-outs |
| A Toronto cleaning company's price page, final cleans | February 2026 | $0.25 to $0.50 |
| A Canadian cleaning company's rate guide | December 2025 | $0.10 to $0.50: about $0.20 for light dust, $0.50 for heavy |
By phase, the pattern holds even where the numbers don't. A rough clean costs well under a final: HomeStars puts it 30 to 50% lower, and one Toronto company lists $0.10 to $0.20 for a rough against $0.25 to $0.50 for a final. Published touch-up prices are all over the place, and most companies doing the work charge a flat price for the first touch-up and bill every return by the hour.
For jobs too small or too odd for a square-foot price, go hourly. HomeStars puts Canadian residential post-construction at $40 to $60 per cleaner-hour (August 2026), and a Canadian rate guide puts Toronto at $35 to $50 (December 2025).
Price it two ways
A square-foot price on its own is a guess with a decimal point. Check it against hours. Cost guides and operators who publish their job numbers put a final clean at roughly 100 to 200 square feet per cleaner-hour, depending on the dust, the glass and how much is built in. Your own crew's pace beats any of them.
Divide the square footage by your pace, multiply by your hourly rate, and compare. If the two prices are close, quote the square-foot one. If they're far apart, one of your assumptions is wrong, and the site walk will tell you which. Here's the quote from the worked example below, a 3,200-square-foot dental clinic before opening day:
| Line | How it's worked out | Price |
|---|---|---|
| Final clean | 3,200 sq ft × $0.40 | $1,280.00 |
| Glass, inside | 16 panes × $20 | $320.00 |
| Touch-up visit after the millwork | Flat | $250.00 |
| Subtotal | $1,850.00 | |
| HST 13% | $240.50 | |
| Total | $2,090.50 |
The check by hours: 3,200 square feet at 150 an hour is about 21 cleaner-hours, which at $50 an hour is $1,067. The square-foot price is about 20% higher, which is right for a fit-out with cabinets in every room. Close enough to send.
What moves the price up or down
Two 2,000-square-foot jobs can be a $500 clean and a $1,500 clean. These are what make the difference, roughly in order of how much they cost you:
- The dust. A kitchen refresh leaves a film. A full gut with drywall sanding leaves a layer on every ledge, inside every cabinet and in the vents. Fine dust takes two or three passes, dry before wet, or it turns to paste.
- The glass. Construction windows take two to three times as long as normal ones: paint, stickers, silicone, sometimes mortar. Count the panes and give them their own line.
- How many visits, and how far apart. Three cleans over six weeks is three trips, three setups and three chances for the schedule to slip. Price each one.
- The deadline. A clean that has to be done in one day needs more people on site at once. A two-day window lets a smaller crew do it.
- What's built in. Cabinets, closets, shelving and appliances all have insides. A dental clinic with eight operatories has more cabinet than a warehouse has floor.
- Water, power and heat. If the water isn't on at the sinks, you're hauling it in buckets. Ask.
- Height and access. High ceilings, open-to-below foyers and exterior glass above the ground floor mean ladders, a lift or a window company.
- Getting in. Downtown parking, a loading dock you have to book, a freight elevator shared with the drywallers.
Floor stripping and waxing, carpet extraction, pressure washing and hauling away debris are usually priced as separate lines or left to a specialist. Say which on the quote.
The site walk: what to check before you quote
The most consistent advice from people who do this work for a living is short: don't price a post-construction job you haven't seen. Photos show you the mess. They don't show you that the water's off, the elevator's booked or the millwork installer is back on Friday.
Take your own photos, and leave with answers to these:
- The square footage, and what it includes. Ask for the plan or the listing. Measure the rooms that matter if the number looks wrong.
- Which cleans they want, and when. Rough, final, touch-up or a mix. The date the site is ready, the date it has to be done, and who decides it's ready.
- Who's still coming back. Every trade that returns after your final is a touch-up you'll be asked for.
- Utilities. Water at the fixtures, power at the outlets, and heat if it's January.
- Glass. How many panes, inside only or both sides, and whether the windows were covered during the work.
- Access and parking. Where you unload, when the building is open, keys or a lockbox, and where the garbage goes.
- Site rules. Active construction sites usually expect boots, a hard hat and a hi-vis vest, and some want a safety orientation before you start. Ask before you arrive with a crew in running shoes.
If you really can't get there, ask for a video of every room plus the contractor's scope or purchase order, and read it. A scope can bury a second final clean, or a clean after every trade, in one line, and you'll be held to it.
Scope and exclusions: write down what isn't included
A post-construction quote goes wrong in the gap between what you priced and what the client pictured. Close it on paper. A good quote has four parts:
- What you'll clean, by area. Not "final clean, 3,200 sq ft", but reception, eight operatories, two washrooms, the staff kitchen, the sterilization room and the corridors. If it's one phase of several, say which.
- The price, line by line. The clean, the glass, each touch-up visit and anything else, each on its own line, with the tax shown separately. A client who wants to drop the glass can, without you redoing the quote.
- What's not included. The line that saves the most arguments.
- When it's done, and what happens after. Who signs off, and how anything after sign-off is billed.
Exclusions most post-construction quotes should spell out:
- Exterior glass above the ground floor
- Paint, stucco or concrete removal beyond small spots
- Floor stripping, waxing, sealing or polishing
- Hauling away construction debris and packaging, or say it's included and how much
- Re-cleans after sign-off because a trade came back, billed by the hour
- Scratches on glass from debris already in it (many window cleaners ask the client to sign a waiver)
Getting paid on a big job
Homeowners pay like any other cleaning customer, and a deposit at booking is normal on a job this size. Builders and general contractors are different: 30-day terms are common, and longer happens. In Ontario, the Construction Act requires a 10% holdback on payments under the contracts it covers, released later. Whether your cleaning contract is one of them depends on the job, so ask a construction lawyer before you sign builder work, and plan your cash either way.
Contractors in Ontario often ask for a WSIB clearance certificate before you start, because it protects them from a subcontractor's unpaid premiums. Check with WSIB whether your company needs coverage, and have your liability insurance certificate ready before the first site walk.
Quoting offices and other commercial cleaning
Office cleaning is the opposite of post-construction: small visits, every week, for years. It's quoted by the month, and the math starts with time, not area.
- Walk it and count it. Desks, washrooms, kitchens, floor types, and anything unusual, like a server room nobody's allowed in. Ask what the current cleaner misses. That's what you'll be judged on.
- Agree what happens on each visit. Garbage and recycling, washrooms, the kitchen, desks wiped, floors vacuumed and mopped. Then what happens weekly or monthly: high dusting, glass, baseboards.
- Work out the hours per visit. Offices go faster per square foot than homes because the spaces repeat, but a dental office is slower than an open-plan floor.
- Hours × your rate × visits a month. Three visits a week is about 13 a month. Add supplies, then check the monthly total against what it works out to per square foot.
For a sense check: HomeStars puts Canadian office cleaning at about $500 to $2,000 a month for 1,000 to 5,000 square feet, and $2,000 to $5,000 or more above that, assuming two to five visits a week (2026). Medical and dental offices run higher.
Commercial clients expect paperwork a homeowner never asks for: a written scope, a certificate of insurance and an invoice with your HST number on it (more in invoices and Canadian tax). And the best source of office contracts is often the post-construction job itself: the people moving into the space you just cleaned need a cleaner next week.
Commercial and post-construction requests in More Knocks
More Knocks doesn't price a construction site for you. Nothing should, sight unseen. It collects what you need to price it, keeps the request from getting lost, and runs the job like any other once it's booked.
Two proper request forms
There's a commercial request form and a post-construction request form, separate from the instant quote for homes. The client sends the square footage, site details, timing and photos up front.
Every request, tracked to a quote
Requests land in one pipeline, with everything the client sent on one page. You can see what's new and what's been quoted, so a $3,000 request doesn't sit in an inbox behind a newsletter.
A quote they sign online
Send the price as a signed quote: a flat price for the scope, with optional lines the client can add, accepted and signed on their phone. That's your record of what was agreed when someone asks, three weeks later, whether the windows were included.
Booked like any other job
Once it's booked, it's on the same calendar, in the same crew app and on the same payments as your house cleans. Book the touch-up as a follow-up visit and it stays linked to the original job, with its photos and notes. Every invoice carries your HST number.
Before you send a post-construction quote: a checklist
Run through this before any quote over a few hundred dollars goes out:
Is this quote ready?
- You've walked the site, or have a video of every room and the contractor's scope
- The square footage is confirmed, and you know what it includes
- Each clean (rough, final, touch-up) has its own line and its own date
- The glass is counted and priced separately
- You've priced it by the square foot and by the hour, and the two roughly agree
- Water, power and access are confirmed for the day of the clean
- The exclusions are written down, including re-cleans after sign-off
- Payment terms are on the quote, and you know whether a holdback applies
- Your insurance certificate, and a WSIB clearance if they ask, are ready to send
- HST is on its own line, and your HST number is on the quote
Questions
What owners ask about commercial & post-construction
How much should I charge per square foot for post-construction cleaning?
Canadian price guides and cleaning companies published about $0.15 to $0.55 a square foot for homes and condos and $0.22 to $0.70 for commercial spaces between late 2025 and August 2026, with Toronto and Vancouver at the top. Where you land depends on the dust, the glass, the number of visits and the deadline. Check any square-foot price against the hours it will really take.
What's the difference between a rough, final and touch-up clean?
A rough clean happens after drywall and before paint and flooring: debris out, floors swept and vacuumed. The final clean comes after the trades finish and covers everything top to bottom, including glass, cabinets and floors. A touch-up comes after the punch list, for the dust the trades brought back. Many jobs need only a final and a touch-up.
What goes in a post-construction cleaning quote?
What you'll clean, room by room or area by area; each clean and each extra, like glass, on its own line with HST shown separately; what isn't included, such as exterior glass, floor stripping or debris removal; the dates; and how anything after sign-off is billed. The exclusions line saves the most arguments.
Should I quote a post-construction job without seeing it?
Try not to. Photos show the mess but not whether the water is on, whether trades are coming back or how many panes of glass have stickers. If you can't walk the site, ask for a video of every room and the contractor's scope, and read the scope for extra cleans buried in one line.
How do I price office cleaning?
Walk the office, agree what happens on every visit and what happens weekly or monthly, and work out the hours per visit. Multiply the hours by your rate and by the visits in a month (three a week is about 13), add supplies, then sense-check it per square foot. HomeStars puts 1,000 to 5,000 square feet at about $500 to $2,000 a month in 2026.
What do contractors ask for before I start?
Usually a certificate of liability insurance and, in Ontario, often a WSIB clearance certificate, which protects them from a subcontractor's unpaid premiums. Builders may also pay on 30-day terms or longer, and Ontario's Construction Act requires a 10% holdback on contracts it covers. Ask a construction lawyer whether it covers yours.
Does More Knocks price post-construction jobs for me?
No, and we'd be wary of anything that prices a site it hasn't seen. More Knocks gives your clients a commercial form and a post-construction form that collect the square footage, site details, timing and photos, tracks every request through to a quote, and books the job like any other once it's signed.
Commercial & post-construction in practice
Guides that cover this
KnoxThe how-to, with the rules and real prices.
Commercial & post-construction is one piece
More to run the company
KnoxSame login, same customers, same numbers. Pick one, I'll wait.
See More Knocks run one of your own jobs
Book 20 minutes with one of the founders. We'll walk a real booking from quote to payment and tell you straight whether it fits your company.
Book your demo